Armour Research Foundation Experimental Foundry
1939-1940 (demolished ca. 1943)
34th and Federal Streets
This brick and steel building served as a temporary foundry for the Armour Research Foundation during the construction of the ARF Metals Building (now the Materials and Metals Building) in 1943.
See this item on the map
See this location on Google Maps
Collapse sources
Name:
"$35,000 Foundry Begins Research in Die Casting," Armour Tech News, May 7, 1940, 1.
Armour Institute of Technology, Bulletin of the Armour Institute of Technology XXIV, no. 2 (May, 1940), 155.
Dates:
"$250,000 Contract Awarded For Erection Of Metallurgical Building," Technology News, December 12, 1941, 1.
"$35,000 Foundry Begins Research in Die Casting," 1.
"Erection Begun on Foundry Lab Research Unit," Armour Tech News, December 12, 1939, 1.
"$35,000 Foundry Begins Research in Die Casting," Armour Tech News, May 7, 1940, 1.
Armour Institute of Technology, Bulletin of the Armour Institute of Technology XXIV, no. 2 (May, 1940), 155.
Dates:
"$250,000 Contract Awarded For Erection Of Metallurgical Building," Technology News, December 12, 1941, 1.
"$35,000 Foundry Begins Research in Die Casting," 1.
"Erection Begun on Foundry Lab Research Unit," Armour Tech News, December 12, 1939, 1.
Have a question, correction, or a story that you'd like to share about this building? Contact us at [email protected].